Eiko
The power cube
Eiko is the latest generation solution for recharging up to 25 vehicles with the power of a single charging point. Eiko has been designed to cope with the growing number of electric vehicles in your car parks. Our teams have designed the most advanced and scalable system on the market in terms of energy optimisation. Our power cube is easy to install, requires no work and offers you unrivalled flexibility.
Eiko is the latest-generation solution for recharging up to 25 vehicles with the power of a single charging point. Eiko has been designed to cope with the growing number of electric vehicles in your car parks. Our teams have devised the most scalable and energy-optimised system on the market. Our power cube is easy to install, requires no work and offers you unrivalled flexibility.
Thanks to its revolutionary design, Eiko is the most economical energy storage and charging solution for electric vehicles on the market.
Its unique, low-power connection to the grid means you don’t have to modify your electrical infrastructure, change your Point of Delivery (PDL) or maintain your subscription.
Its above-ground installation, in just a few days, reduces the impact on your daily activities and requires no civil engineering work (VRD). Its batteries store energy during off-peak hours and maximize the benefits of your solar production by recovering its surplus.
In its second-life batteries, Eiko stores energy when it’s available, and redistributes it to vehicles when they need it, at a higher power than the grid alone would allow.
This storage system meets the recharging needs of each user, and optimizes the energy consumption of the entire building, taking advantage of off-peak storage and surplus solar panel production.
In its second-life batteries, Eiko stores energy when it’s available, and redistributes it to vehicles when they need it, at a higher power than the grid alone would allow.
This storage system meets the recharging needs of each user, and optimizes the energy consumption of the entire building, taking advantage of off-peak storage and surplus solar panel production.
Even faster to deploy, even simpler to use, even more intelligent and just as modular and scalable.
With this new version, Eiko has changed its appearance, but that’s not all!
A genuine energy optimisation and recharging platform, Eiko can be deployed in a parking space in just 3 days, recharging up to 25 cars from a single connection to the limited-power electricity grid.
With its Grid Reinjection functionality, Eiko can now supply the building with the energy stored in its batteries, boosting self-consumption of your solar energy and optimising your off-peak contract to the maximum.
The user experience is made easier thanks to its angled screen and centralised authentication and payment facilities. It can also be customised in your brand’s colours.
Number of 7.4 kW AC charge points: from 8 to 25
Grid connection capacity: from 10 to 37 kW
Total charging capacity : 45 or 60 kW
From 50 to 150 kWh
Second life batteries
Solar panel connection
Outdoor parking
Civil engineering-free installation
Deployment time : 3 days
Employee badge
Credit card
Mobility badge
OCPP 1.6 interoperability
Energy management and Network reinjection
Order taking, prioritization and alternatives
Vénissieux, France
Your project
Every parking lot is different.
Every customer has his or her own uses.
Our solutions are modular and scalable, so that your recharging infrastructure is always perfectly suited to your needs.
The electrification of the car fleet is a continuous process. But the electrification of a car park is an iterative process: it takes place in successive waves of new charge points, so should we install more charge points than are needed at any one time? In fact, spaces equipped with charge points become exclusively electric spaces. Oversizing the number of charging points in a car park is tantamount to denying access to some customers. At the same time, undersizing means ensuring that future electric motorist customers will be dissatisfied, and that work will have to be carried out repeatedly to keep the service up to date. The benefits of a solution that can be upgraded quickly and simply, without work, to meet customer needs at all times are undeniable.
You rent your site and don’t want to invest in a solution that you’ll have to leave in place when you move. Whether this move is already planned or simply possible in the near future, it can’t be a sufficient reason to postpone the installation of charge points in your car park. With an EVSE designed to be installed above ground, you can meet these recharging needs now, before you move, with your solution.
For electromobilists, the experience of recharging at public charging points can be tedious, and you don’t want this to be the case in your establishment. And you don’t want that to be the case in your establishment. To offer your customers an experience worthy of your brand image, make it easier for them to access recharging by taking care with the payment methods offered, the transparency of pricing and the fluidity of the ordering process. For those who wish to pay with their mobility badge, your EVSE will have to be interoperable and officially open to the public. But the simplicity of payment by credit card could also appeal to your customers.
It can be difficult to know how many bollards to add to your parking lot. Having carried out a number of studies and models on behalf of our customers, we’re able to put your data to the test and make the right decisions.
Our teams install Eiko in just 1 week. The system has been designed so that an Eiko can be transported and deployed in just a few days in all your parking lots.
How do you define the performance of a workplace charging station, if not by satisfying the employee’s needs?
It’s all about supplying them with the amount of energy they need for their daily commute for the duration of their parking time. And this can be anything from a few hours to a whole day.
In a company parking lot, the charging station will deliver small doses of energy over long parking periods. The complexity then lies in prioritizing the most urgent sessions, and ensuring the availability of charging points for all those wishing to recharge.
Charge points that are not monopolized, and uninterrupted service.